Sign In | Join Free | My adobecards.com
China Dongguan chengkang mold plastic co., ltd logo
Dongguan chengkang mold plastic co., ltd
Dongguan Chengkang Mold Plastic Co.,Ltd
Active Member

4 Years

Home > PP Injection Moulding >

CNC EDM SGS Window End Cap , LKM Plastic Parts Mold Injection Mould And Molding

Dongguan chengkang mold plastic co., ltd
Contact Now

CNC EDM SGS Window End Cap , LKM Plastic Parts Mold Injection Mould And Molding

  • 1
  • 2
  • 3

Brand Name : OEM

Model Number : PP Injection Moulding

Place of Origin : Dongguan,China

MOQ : 500

Price : Negotiable

Payment Terms : T/T, D/A, L/C, D/P, Western Union, MoneyGram

Supply Ability : 3000pcs/per day

Delivery Time : 30 workdays

Packaging Details : PE Plastic Packaged in Carton

Certification : SGS

Product material : PP

Shaping mode : Injection Mould

Surface treatment : Texture

Size : 70*53*66.5mm

Color : Black

Mould base : LKM

Contact Now

Window Frame End Cap Left Injection Molding Components Mold Plastic Parts

Name Window Frame End Cap Left Injection Molding Components Mold Plastic Parts
Core Material High hardness alloy steel with heat treatment, wear resistance, corrosion resistance
Plastic Material PP
Mold Equipment CNC, EDM, precision grinder, milling machine, driller, wire
Products Color Black
Application Area PP Injection Moulding
QC Equipment Quick checking tools
Delivery Time 4-8 weekends
Package Method Mold by wooden box, products by carton. As you required
Export Port Shenzhen port

About us

we produced plastic parts and mould over 23 years,have worked with many europe countries and east asia countries,

Why choose us?

1,we have bussiness with our credits in this field been 23 years

2,best facilities to produce quality products

3,we offer you service in 24/7

4,lead time is timely

5,last but not the least,factory price with quality products

FAQ

Q: What industries do your products mainly cover?
A: In the past 20 years, we have developed and manufactured moulds including electronic products, furniture, lighting products, daily necessities, medical equipment, engineering equipment, etc.

Q:How long does it take to get my production?
A:Our lead time is around 25-30 workdays,and the delivery time is around 7-14 days.

Product Tags:

CNC EDM Window End Cap

      

SGS Window End Cap

      

LKM Plastic Parts Mold

      
 CNC EDM SGS Window End Cap , LKM Plastic Parts Mold Injection Mould And Molding Manufactures

CNC EDM SGS Window End Cap , LKM Plastic Parts Mold Injection Mould And Molding Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Dongguan chengkang mold plastic co., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)